NAMBUCCA SHIRE COUNCIL
Special
Meeting of Ordinary Council - 27 August 2008
AGENDA Page
1 APOLOGIES
2 PRAYER
3 DISCLOSURE OF INTEREST
4 CONFIRMATION OF MINUTES — Ordinary
Council Meeting - 21 August 2008
5 Notices
of Motion
5.1 Notice of Motion -
Withdrawal of Mobile Breast Screening Services from the
6 DELEGATIONS—Motion to
hear Delegations
9.4 Bowraville
Recreation Club Co-operative Limited - Request to Waive Loan Balance and Lift
Caveat on Title
(i) Mrs
Margaret Mottley on behalf of Bowraville Recreation Club
7 ASKING OF QUESTIONS WITH
NOTICE
8 QUESTIONS FOR CLOSED
MEETING WHERE DUE NOTICE HAS BEEN RECEIVED
9 General Manager Report
9.1 Quarterly
Review - Performance Targets Achievements to 30 June 2008
9.2 Report
on Investments to 31 July 2008
9.3 Changes
to Local Government Act - Register of Donations and Expenditure Declarations -
Recording which Councillors Vote For and Against Each Planning Decision
9.4 Bowraville
Recreation Club Co-operative Limited - Request to Waive Loan Balance and Lift
Caveat on Title - DELEGATION
9.5 Promoting
Better Practice Program Report
9.6 Christmas
Holidays Closure
10 Director Environment and Planning Report
10.1 Final
Report on review of Council's Policies - Environment Planning Department
10.2 Development
Applications Determined Under Delegated Authority from 9 July 2008 to 20 August
2008
10.3 Outstanding
Development Applications more than 12 Months, Applications where submissions
have been received and not determined
10.4 Report
on Australian Institute of Building Surveyors -
10.5 Development
Application Statistics with Comparable Figures for all Developments for
2007/2008 and Comparable Years from 2003-2007
11 Director Engineering Services Report
11.1 DA2007/800
- Integrated Housing at 8 Pacey Street, Nambucca Heads
11.2 DA2006/056
- Residential Submission, South Macksville
11.3 Policy
Review - Public Gates and Motor Bypass (Grids)
11.4 Works
Depot Improvements
11.5 Macksville Sewerage Treatment Plant - Effluent Reuse
12 General Manager's Summary of Items to be
Discussed in Closed Meeting
It is recommended
that the Council resolve into closed session with the press and public excluded
to allow consideration of this item, as provided for under Section 10A(2) (d)
of the Local Government Act, 1993, on the grounds that the report contains
commercial information of a confidential nature that would, if disclosed (i) prejudice
the commercial position of the person who supplied it; or (ii) confer a
commercial advantage on a competitor of the Council; or (iii) reveal a trade
secret.
12.2 Council
Owned Buildings for Public Use - Essential Fire Safety Measures
It is recommended
that the Council resolve into closed session with the press and public excluded
to allow consideration of this item, as provided for under Section 10A(2) (d)
of the Local Government Act, 1993, on the grounds that the report contains
commercial information of a confidential nature that would, if disclosed (i)
prejudice the commercial position of the person who supplied it; or (ii) confer
a commercial advantage on a competitor of the Council; or (iii) reveal a trade
secret.
12.3 Proposed
Major Project Corner Ridge and
It is recommended
that the Council resolve into closed session with the press and public excluded
to allow consideration of this item, as provided for under Section 10A(2) (d)
of the Local Government Act, 1993, on the grounds that the report contains
commercial information of a confidential nature that would, if disclosed (i)
prejudice the commercial position of the person who supplied it; or (ii) confer
a commercial advantage on a competitor of the Council; or (iii) reveal a trade
secret.
i Motion To Close The Meeting
ii Public Verbal Representations Regarding Proposal To Close
iii Consideration Of Public Representations
iv Deal With Motion To Close The Meeting
13 MEETING CLOSED TO THE PUBLIC
14 REVERT TO OPEN MEETING FOR DECISIONS IN RELATION TO ITEMS DISCUSSED IN CLOSED MEETING.
27 August 2008 |
Notice of Motion
ITEM 5.1 SF793 270808 Notice of
Motion - Withdrawal of Mobile Breast Screening Services from the
AUTHOR/ENQUIRIES: George Hicks, Mayor
Summary: Councillors will have
received a copy of a response from Mr Chris Crawford, Chief Executive of the
North Coast Area Health Services, in relation to its representations
regarding the withdrawal of mobile breast screening from the Whilst Mr Crawford
advises that the I believe that Council
should note Mr Crawford’s response and reply that it still does not support
the withdrawal of the mobile service.
If the service is not reinstated, Mr Crawford should be requested to
undertake a full evaluation of its withdrawal after 12 months. I will be interested to know the number of
preventative breast screenings which were conducted for |
That Council note
Mr Crawford’s response but advise him that in Council’s view the mobile van
based service is the best means of ensuring that women in the target age
group undertake the recommended screening.
Further, that if the service is not reinstated, the Area Health
Service should undertake a full evaluation of its withdrawal after 12 months. |
1View |
Doc no. 19648/2008 - Information in response to
correspondence regarding the withdrawal of mobile BreastScreening from the |
|
27 August 2008 |
General Manager's Report
ITEM 9.1 SF820 270808 Quarterly
Review - Performance Targets Achievements to 30 June 2008
AUTHOR/ENQUIRIES: Michael Coulter,
General Manager
Summary: In accordance with the provisions of
Section 407 of the Local Government Act 1993 I wish to report the extent to
which the performance targets set in Council 2007/2008 Management Plan have
been achieved. |
That Council note
the extent to which the Performance Targets have been achieved for the
quarter to 30 June 2008. |
1View |
18135/2008 - Quarterly Reviews - Performance
Targets - to 30 June 2008 |
|
PERFORMANCE TARGETS
TO
30 June 2008
GENERAL MANAGER
DIRECTOR ENGINEERING SERVICES
DIRECTOR ENVIRONMENT
AND PLANNING
Special Meeting of Ordinary Council - 27 August 2008 Quarterly Review - Performance Targets Achievements to
30 June 2008 |
Attachment
1 18135/2008 - Quarterly
Reviews - Performance Targets - to 30 June 2008 |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
CORPORATE DEVELOPMENT |
|
|
OBJECTIVE |
To ensure a progressive and proactive approach to
the provision of appropriate, effective and efficient services. |
|
|
STRATEGY |
Develop long term strategic corporate and
financial planning objectives that reflect the Council’s goals and the
community needs. |
RESPONSIBLE OFFICER |
General
Manager |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Ascertain community values so as to
prepare a long term strategy plan |
· Undertake community survey |
· Community survey undertaken in 2007 with
results to be incorporated in Management Plan for 2008/2013 |
100% |
|
Develop a long term strategic plan for the community |
· Identify community's main priorities and expectations for the future
and plan strategies for achieving these goals |
· Community strategic plan completed by 31 December 2008 |
100% |
|
Develop a long term asset management plan |
· Implement an asset management system to meet corporate, financial and
community requirements for asset maintenance, asset renewal and asset
upgrades |
· System implemented by 30 June 2008 |
20% |
Delays recruiting.
Development of policy and software assessment underway. |
Review Council's policies and delegations |
· Review and update policies and delegations |
· Review completed by 30 June 2008 |
80% |
Delegations complete. 40 policies from 250 still to be done. |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
CORPORATE SUPPORT SERVICES |
|
|
OBJECTIVE |
To provide a high standard of administrative
support to meet Council and Community needs. |
|
|
STRATEGY |
Refine and maintain processes to deliver timely
and accurate information to Council and the Community. |
RESPONSIBLE OFFICER |
General Manager |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Make Council meetings easier to follow and improve
the accuracy of the minutes |
Install an electronic business paper |
· Motions can be reviewed on a screen before being put · Minutes finalised at conclusion of meeting · Minutes posted on website the following morning |
90% |
Not practical to complete minutes at meeting. Otherwise ok. |
Special Meeting of Ordinary Council - 27 August 2008 Quarterly Review - Performance Targets Achievements to
30 June 2008 |
Attachment
1 18135/2008 - Quarterly
Reviews - Performance Targets - to 30 June 2008 |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
FINANCIAL MANAGEMENT |
|
|
OBJECTIVE |
Maintain a sound and sustainable financial
position. |
|
|
STRATEGY |
Ensure the timely provision of financial advice
and information to support Council’s decision making processes. |
RESPONSIBLE OFFICER |
Manager Financial Services |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Prepare a long financial plan |
· 10 year financial plan which incorporates estimates
for growth in revenue and grants, planned capital projects including asset
management, and projected operational expenditure |
· Plan ready for consideration for 2008/2013 Management Plan |
50% |
Draft 20 year
Community Strategic Plan and Draft 5 yr Infrastructure Management Plan
produced with Draft Management Plan. |
Maximise return on investment portfolio |
· Invest surplus funds in accordance with
Council strategy and independent advice |
· Investments return comparable with
benchmarks set in Council's investment strategy |
15% |
Continued
volatility in investment markets requires assessment and monitoring to be
with each Quarterly budget review. |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
CUSTOMER SERVICE |
|
|
OBJECTIVE |
To sustain a high level of customer satisfaction. |
|
|
STRATEGY |
Deliver a consistent level of quality service at
all times. |
RESPONSIBLE OFFICER |
General Manager |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Improve Customer Service |
· Prepare customer service charter · Provision of training in implementation
of customer service charter |
· Customer service charter prepared before 31 December 2007 · Charter considers all aspects of customer service—face to face,
telephone, enquiries · Charter considers all aspects of customer service—face to face,
telephone, enquiries, complaint handling · Training provided to all indoor staff and outdoor supervision staff
by 30 June 2008 · Charter adopted by Council and posted on Council's web site. |
10% |
Preliminary work has been undertaken on
requests. Review of customer request
system software undertaken. Unable to
identify cost effective software replacement at this stage. |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
RISK MANAGEMENT AND INSURANCE SERVICES |
|
|
OBJECTIVE |
To continue to improve safety in the workplace
and the public environment and maintain appropriated insurance protection. |
|
|
STRATEGY |
Implement policies, procedures, practices and
initiatives to improve safety and protect Council’s assets. |
RESPONSIBLE OFFICER |
Safety Officer |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Maintain a Strategic Risk Management Program |
Deliver relevant training and effective awareness
programs to staff on workplace safety |
· Induction of staff · Number of training and awareness programs
conducted. · Number of work related claims or reported
incidents. |
100% |
|
Conduct regular safety audits of work sites |
· Number of safety audits conducted. · Level of compliance · Staff awareness |
100% |
|
|
Develop and maintain relations with external service
provides to ensure legislative compliance and awareness of latest
developments in risk management |
· Attendance at Risk Management Group and
Safety Group meetings. · Legislative compliance · Policies and procedures are reviewed in
response to legislative requirements and industry developments. |
100% |
|
|
Carry out risk assessment and analysis |
· Safety Management Plans and Safe Work
Methods Statements reviewed and updated. |
75% |
On-going |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
INFORMATION TECHNOLOGY |
|
|
OBJECTIVE |
Continued development of information technology
and utilise technological advances to improve Council’s overall efficiency. |
STRATEGY |
Serve the Council with current, cost effective
and responsive information technology |
RESPONSIBLE OFFICER |
Manager Information Technology |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Investigate cost of replaying Council's Fujitsu
software |
Assess alternative software products |
· Report on the future of the Fujitsu
software and alternatives to be considered by Council before 30 June 2008 |
50% |
Underway. MOU with LoGITA Fujitsu Councils for joint
tender. Tender expected August 2008. Demonstrations and Evaluation to follow. |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
HUMAN RESOURCES |
|
|
OBJECTIVE |
To provide effective human resources management. |
|
|
STRATEGY |
Implement and maintain appropriate human resource
management practices |
RESPONSIBLE OFFICER |
Manager Human Resources |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Develop new industrial agreement for Council staff |
Consult with Council staff and unions: determine
whether Federal, State or unregistered; in consultation with the General
Manager resolve issues |
New industrial agreements in place by 30 June 2008 |
0% |
Legislation post Work Choices silent on local
government. Deadline will not be
achieved. |
PRINCIPAL ACTIVITY |
ECONOMIC AFFAIRS |
|
|
FUNCTION |
TOURIST PROMOTION |
|
|
OBJECTIVE |
To encourage and facilitate promotion of the |
|
|
STRATEGY |
Promote the area as a desirable tourist or
visitor destination |
RESPONSIBLE OFFICER |
Manager Business Development |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Develop a local tourist industry strategy |
Produce an action plan to build on an develop
existing structure and product to enhance the sustainability of tourism in
the Shire |
Strategy adopted by 31 December 2007 |
100% |
Implementing action plans. |
PRINCIPAL ACTIVITY |
RECREATION AND CULTURE |
|
|
FUNCTION |
SWIMMING POOLS |
|
|
OBJECTIVE |
Provide public swimming pool for active and
passive recreational needs |
|
|
STRATEGY |
Provide safe and healthy
swimming pool and facilities within allocated resources. |
RESPONSIBLE OFFICER |
General Manager |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Maintain water quality |
Testing and recording of
water a minimum of twice per day |
· Test results compared to Health Department Standards / Guidelines |
100% |
Independent lab testing
conducted once a month. Records now
maintained. |
Improve pool facilities
and maintenance requirements |
Asset Management Plan |
· Ongoing improvement funding · Meet OH&S Standards and WorkCover safety requirements |
100% |
Water slide now has Work
Cover approval. Plans for upgrading
chemical storage being prepared. These plans are now being provided with
engineers reports. Project being prepared for
construction of Chemical storage facility. |
Water safety guidelines |
Seasonal review of
Management Plan with pool management |
· Compliance with State guidelines and legislation |
100% |
|
PRINCIPAL ACTIVITY |
ECONOMIC AFFAIRS |
|
|
FUNCTION |
TOURIST PROMOTION |
|
|
OBJECTIVE |
To encourage and facilitate promotion of the |
|
|
STRATEGY |
Delegation to Australia’s Holiday Coast in
conjunction with Nambucca Valley Tourism Advisory Group to promote the
Council area as a desirable tourist or visitor destination. Provide an
efficient and relative tourism information service. |
RESPONSIBLE OFFICER |
General Manager |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Ensure the services of the Visitor Information
Centre are well utilised. |
· Continually update displays and
presentation material · Promote booking services · Train and support VIC Volunteers · Develop visitors guides |
Increased visitation and enquiries to the Centre. |
100% 100% 100% 100% |
On-going On-going On-going On-going |
Active and supportive participation in local and
regional marketing and events |
· Provide assistance and support in
coordination and expansion of local events and festivals · Participate in promotions and events that
advertise and promote tourism for Shire · Contribute to and participate in regional
tourism activities/events |
· Expansion of existing and development of
new events and festivals · Promotional material distributed Events
attended · Participate in regional activities/events |
100% 100% 100% |
On-going On-going Tradeshow DVD completed 2007 On-going Attended Sydney, Melbourne & Brisbane
trade shows. |
PRINCIPAL ACTIVITY |
ECONOMIC AFFAIRS |
|
|
FUNCTION |
BUSINESS DEVELOPMENT & PROMOTION |
|
|
OBJECTIVE |
To foster local employment opportunities and
economic self-sufficiency |
|
|
STRATEGY |
Develop and promote the Council area as a
desirable location for economic development |
RESPONSIBLE OFFICER |
Economic Development Officer |
PERFORMANCE
TARGET |
MEANS
OF ACHIEVING TARGET |
PERFORMANCE
INDICATORS |
EXTENT
ACHIEVED |
REASON
FOR VARIATION |
Attract new business |
· Service all business and investment
enquiries received. · Seek out and encourage new investment
opportunities. |
· Number enquiries received · Business and employment opportunities
created |
100% 100% |
On-going On-going |
Provide quality business information to promote and
expand Economic Development. |
· Maintain database of economic information
and development opportunities · Develop economic development information
service on Website. · Maintain and expand various brochures,
kits, promotional material for business and industry development. |
· Database current · Website developed. · Material relevant and distributed. |
100% 100% 100% |
On-going On-going On-going |
Liaise with business and industry with the Shire to
assist their sustainability and growth. |
· Maintain links with Department of State
and Regional Development and develop links with other relevant government and
non Government organisations. · Regular meetings with existing business. |
· Existing relationships maintained and new
networks established. · Meetings held |
100% 100% |
On-going On-going |
Participate in local and regional promotions etc. |
· Attend relevant festivals, events,
promotions and exhibitions. |
· Attendance at relevant
events etc. |
100% |
On-going |
PRINCIPAL ACTIVITY |
ECONOMIC AFFAIRS |
|
|
FUNCTION |
LAND DEVELOPMENT |
|
|
OBJECTIVE |
To pursue opportunities for development of
residential and industrial and provide economic gain and growth to Council |
|
|
STRATEGY |
Ensure a diversity of residential and industrial
and throughout the Shire to meet all growth demand |
RESPONSIBLE OFFICER |
Property Officer |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Maintain adequate supply of land stock for residential
and industrial development |
Review land stock and identify good quality real
estate for development |
· Land stock · Land sales |
100% |
Modification to the |
Special Meeting of Ordinary Council - 27 August 2008 Quarterly Review - Performance Targets Achievements to
30 June 2008 |
Attachment
1 18135/2008 - Quarterly
Reviews - Performance Targets - to 30 June 2008 |
PRINCIPAL ACTIVITY |
ADMINISTRATION |
|
|
FUNCTION |
PLANT AND EQUIPMENT |
|
|
OBJECTIVE |
Manage Council’s Plant and Equipment in an effective and cost
efficient manner. |
|
|
STRATEGY |
To provide a cost effective plant management service to Council
incorporating plant replacement and maintenance service |
RESPONSIBLE OFFICER |
Manager Civil Works |
|
||||
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
||
Replace
plant at the most cost effective time |
Develop
economic analysis system and 20 year plant replacement plan. Establish
and maintain a Plant Replacement Reserve. |
Economic
analysis system presented to Plant Committee |
0% |
Awaiting auditors advice |
||
|
|
20 year plan reviewed annually in February |
100% |
|
||
|
|
Funds allocated in accordance with 20 year plan |
0% |
Funds identified in 20 year plan reduced by Council |
||
Maintain an adequate level of plant utilisation,
operating costs and income. |
Plant stand down time minimised Undertake private works to fill quiet periods Review plant operating costs |
Stand down time compared to previous period. |
100% |
Basic information only. No formal fleet management system in place |
||
|
|
Percent of actual hours operated against hours available
compared to previous quarter. |
100% |
Quarterly reports prepared |
||
|
|
Plant operation reports presented to Plant Committee
on a quarterly basis. |
0% |
All reports now to Council |
||
|
Review hire rates on a quarterly basis |
Review completed and hire rate variations adopted. |
100% |
|
||
Have plant available for use on each working day as
required. |
Maintain a mechanical workshop and associated staff
and equipment. Ensure all plant and vehicle items are inspected for
RTA registration. |
Workshop in place and staffed. |
100% |
|
||
|
|
Inspections completed in February. |
100% |
|
||
PRINCIPAL ACTIVITY |
PUBLIC ORDER AND SAFETY |
|
|
FUNCTION |
FIRE CONTROL |
|
|
OBJECTIVE |
To protect the environment, health and safety of the community by
providing an effective response to fire related emergencies in accordance
with the Service Land Level Agreement with the Rural Fire Service |
|
|
STRATEGY |
To maintain an effective volunteer Rural Fire Service to protect the
community from bush fire related emergencies |
RESPONSIBLE OFFICER |
Director Engineering Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide advice and inspect areas for bush fire protection management. |
Rural Fire Service to provide timely bushfire related advice in
accordance with relevant codes and standards and best practice with regard to
LEPs, Development Applications, evidence or legal action involving council. |
Development Applications completed or advice provided within 14 days
of receipt. Risk management audit shows reduced risk levels. |
90% |
Local approvals satisfactory. Delays with HQ response. |
|
Rural Fire Service to inspect properties (subject to Council’s request
and upon identifying a possible bushfire hazard on private property), to
ascertain whether RFS should consider the issuance of a s66 notice to a
private land owner/occupier. (CS-05) |
90% of inspections carried out within two working days of a request
from Council. |
100% |
|
Support the suppression of bushfires |
Rural Fire Service to plan appropriate location and type of fire
trails in accordance with Bush Fire Risk Management and Operational Plans.
(CS-07) |
Audit conducted of the trails planned and located. |
100% |
No new trails developed or outstanding |
|
Rural Fire Service to identify fire trails requiring construction and
maintenance.(CS-07) |
50% of recommended trails constructed and maintained in accordance
with agreed plans and standards. |
||
|
Participation on the Nambucca Bush Fire Management Committee. (M-08) |
Minutes available to Councillors Feedback provided. |
100% |
|
PRINCIPAL ACTIVITY |
PUBLIC ORDER AND SAFETY |
|
|
FUNCTION |
FIRE CONTROL |
(continued)
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Ensure the Rural Fire Service can sustain sufficient numbers of
competent and equipped personnel in operations and activities by the
implementation of effective personnel planning programs. |
Rural Fire Service to develop local training plan based on local
training needs, resources, priorities and attitudes, underpinned by the
Service Delivery Model outcomes. Audit and review the effectiveness of the
implementation. (L&D – 03) |
Training Plan developed in accordance with Service SOPs. |
100% |
|
Manage Zone firefighting resources |
Rural Fire Service to issue protective clothing and personal
accessories to all firefighters in accordance with Service. (OPS-20) |
PPE issued to all brigades. |
100% |
|
|
Rural Fire Service to ensure that all equipment listed in Schedule 4
of the Service Level Agreement will be maintained in a serviceable condition
in accordance with the Service Standards. (OPS-22) |
Asset management plan and maintenance schedules developed for all
major plant and equipment. 80% of equipment maintained within specified timeframes. |
100% |
All vehicles inspected for 2007/08 certificates |
Manage Zone property |
Rural Fire Service to review the operational requirements of each
brigade to ensure their stations are of sufficient standard, adequate
maintenance and appropriate location. (M-13) |
Number of stations compared to brigade numbers. Standard of station meets Service Standard specifications. |
100% |
Audit conducted by Head Office. Results yet to be released to local
branches |
PRINCIPAL ACTIVITY |
PUBLIC ORDER AND SAFETY |
|
|
FUNCTION |
EMERGENCY SERVICES |
|
|
OBJECTIVE |
To protect the environment, health and safety of the community with an
effective response to emergency situations |
|
|
STRATEGY |
To support the State Emergency Service organisation in this area |
RESPONSIBLE OFFICER |
Director Engineering Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide and maintain vehicles for the SES |
Replace vehicles in accordance with the Plant Replacement Policy |
Distance travelled and vehicle
age as per Councils plant replacement program. |
100% |
|
Provide access to an operations centre |
Maintained office space and storage area (equipment and plant) |
SES Controller to provide an annual report on facilities by January
prior to budget allocations being determined. |
100% |
|
Provide access to communications equipment |
Phones, fax and office equipment maintained |
SES Controller to advise on equipment condition by January prior to
budget allocations being determined. |
100% |
|
PRINCIPAL ACTIVITY |
PUBLIC ORDER AND SAFETY |
|
|
FUNCTION |
BEACH CONTROL |
|
|
OBJECTIVE |
To ensure the health, safety and well being of the community are
protected during nominated patrol periods. |
|
|
STRATEGY |
Establish, implement and maintain lifeguard services to ensure
compliance with the adopted level of service and within approved allocation
of resources. |
RESPONSIBLE OFFICER |
Director Engineering Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Control lifeguard services during summer school vacation period |
Lifeguard services provided as per contract agreement |
Lifeguards on duty during the identified times in the contract
agreement Annual lifeguard activity reports submitted to Council by 31 March. |
100% |
|
Promote beach safety |
Provide and maintain of beach
safety signage |
Signage complies with Council’s Policy as identified in annual audit,
completed by 30 June 2008 |
0% |
Review of signs that require replacement by 06/08. Jointly with Department of Environment and
Climate Change. No progress. |
|
Voluntary Rangers issue beach driving permits and supervise vehicles
on beaches |
Availability of Voluntary Rangers to check compliance |
100% |
Authorisations renewed |
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
WASTE MANAGEMENT |
|
|
OBJECTIVE |
To protect and where possible enhance the natural environment |
|
|
STRATEGY |
To ensure that the community has a regular, cost effective and
environmentally responsible waste management system |
RESPONSIBLE OFFICER |
Director Engineering Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provision of kerbside recycling, organics and other waste service for |
|
Compliance with contracts |
100% |
|
Achieve a 100% diversion of putrescible waste going to Nambucca
landfill |
Coffs Coast Regional Waste Services to process waste at |
Processing of recycling, organics and mixed commercial waste
transported to |
80% |
Waiting on processing and resource recovery of commercial domestic
type waste |
Maintain an operational local
waste facility for non-putrescible or inert waste |
Design and construction plans regularly revised for future cell
construction |
Annual review of needs |
80% |
Volumetric survey completed.
New cell required by 2011 subject to waste quantities |
Achieve acceptable environmental outcomes for the waste facilities. |
Meet Licence conditions |
Monitoring results, percent compliance with EPA licence. |
50% |
Subject to consultants report and Department of Environment and
Climate Change acceptance |
Rehabilitate filled waste disposal areas. |
Cover cells after being filled to capacity |
Compliance with licence conditions |
50% |
Subject to tests Consultants report and Department of Environment and
Climate Change acceptance. |
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
STREET CLEANING |
|
|
OBJECTIVE |
To maintain and improve urban streets beautification |
|
|
STRATEGY |
To ensure that the footpaths and gutters in urban streets are clean
and free of litter |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Maintain an acceptable level of street and park cleanliness |
Regular servicing of street and park litter bins |
Supervisor(s) to inspect and assess standard achieved |
100% |
|
|
Regular cleaning of commercial areas in Nambucca Heads, Bowraville,
Scotts Head, |
Supervisor(s) to inspect and assess standard achieved |
100% |
|
|
High profile areas swept by specialised vehicle twice per year. |
Complete in December and May. |
100% |
By contractor |
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
PUBLIC CONVENIENCES |
|
|
OBJECTIVE |
To provide safe and healthy public convenience |
|
|
STRATEGY |
To provide sufficient resources to ensure that public conveniences are
maintained in a healthy condition. |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Public Conveniences are clean, healthy and safe and are accessible to
the public. |
Daily servicing of public conveniences. Quarterly pressure cleaning of public conveniences. Respond to Complaints |
Cleaning recorded in Maintenance Management System Supervisor(s) to inspect and assess standard achieved. Reduction in number of complaints received. |
100% |
|
|
Resources are allocated in budget. |
Budget approved to meet targets. |
100% |
|
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
TREE PLANTING |
|
|
OBJECTIVE |
To protect and where possible enhance the natural environment |
|
|
STRATEGY |
To enhance the environment by planting and maintenance of trees on
public land |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE
TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Manage number of trees in streets and parks |
Prepare tree planting program. |
Submit program to Director Engineering Services for approval Trees planted in accordance with adopted programs Species have minimal impact on assets. |
100% |
|
Maintain trees in public places to ensure safety of people and
minimise property damage |
Inspect and act on dangerous trees (remove / lop / advise complainant) |
Within one month of complaint Dangerous trees reported to insurers and Council |
100% |
|
|
Maintain a register of all unsuitable trees for programmed removal or
lopping |
Maintain or remove based on priorities and available funds on
recommended removals |
90% |
|
|
Carry out an annual maintenance program by qualified contractor |
Program completed by December |
100% |
|
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
TREE PLANTING |
|
|
OBJECTIVE |
To protect and where possible enhance the natural environment |
|
|
STRATEGY |
To enhance the environment by planting and maintenance of trees on
public land |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE
TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
|
Replace trees removed with more appropriate species taking into
account location, powerlines, visibility etc. |
Species meet guidelines of Country Energy and Water and Sewer
requirements |
100% |
|
Protect trees from and respond to deliberate damage of trees on public
land |
Develop a strategy of public awareness. Reward information resulting
in conviction. The issuing of fines. Develop a strategy to counter vandalism |
Media Release at least once a year advising of $5,000 reward |
100% |
Banner erected in |
|
|
Reported and/or detected tree damage investigated and actioned
including warning letters or fines. |
100% |
|
|
|
Strategy to counter vandalism adopted by Council by 31 December 2007. |
100% |
Policy adopted by Council |
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
STORMWATER MANAGEMENT |
|
|
OBJECTIVE |
To protect and where possible enhance the natural environment |
|
|
STRATEGY |
Reduce the pollutant load on creeks and rivers by implementing the
Stormwater Management Plan. |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Maintain Gross Pollutant Traps (GPT) provided on main drainage lines. |
Stormwater treatment devices inspected after every 100mm of rain or
every month, which ever comes first and undertake programmed maintenance |
Inspection undertaken and recorded in Maintenance Management System. |
0% |
Review of GPT’s being undertaken and recorded in MMS system |
|
|
Gross pollutant traps cleaned and debris removed at intervals not
exceeding 90 days |
0% |
Not undertaken until 1 July 2008. |
PRINCIPAL ACTIVITY |
HOUSING AND COMMUNITY AMENITIES |
|
|
FUNCTION |
NOXIOUS WEEDS |
|
|
OBJECTIVE |
To protect and where possible enhance the natural environment |
|
|
STRATEGY |
To protect the health of the community and viability of agricultural
land from the invasion of land by noxious weeds |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Control noxious weeds on private land |
Inspector to physically visit properties and if required letter of
advice, Section 18 or 20 Notice issued or fine imposed |
Inspect minimum number of properties per annum as required by grant
conditions. |
100% |
|
Control noxious weeds on Council controlled land |
Inspect Council owned land as required and utilise appropriate control
methods to reduce noxious weeds |
Net reduction in noxious weed infestations Compliance with Pesticides Use Notification Plan. |
100% |
Detailed mapping not available |
|
Map areas of infestation |
Location of noxious weeds input in GIS system |
0% |
Detailed mapping not available |
|
Apply for Noxious Weeds Grant |
Noxious Weed Grant application submitted in May |
0% |
Not due |
PRINCIPAL ACTIVITY |
RECREATION AND CULTURE |
|
|
FUNCTION |
SPORTING GROUNDS, PARKS AND GARDENS |
|
|
OBJECTIVE |
To provide facilities and services in response to the active and
passive recreational and cultural needs of residents and visitors |
|
|
STRATEGY |
To provide and maintain parks, gardens, playgrounds and sporting
fields that satisfy the active and passive needs of the community |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Maintain sporting grounds to service existing needs |
Maintain playing surfaces to an acceptable standard by mowing,
aeration and fertilisation. |
Accomplishment recorded in Maintenance Management System Review with the Committee of Management. |
100% |
|
Parks meet the passive
recreational needs to the community |
Playgrounds are maintained in a safe condition and conform to
Australian Standards |
No inspection more than 12 months old. Maintenance program completed |
100% |
|
|
Parks maintained to an acceptable standard. |
|
100% |
|
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
ROADS AND BRIDGES |
|
|
OBJECTIVE |
Management of the Roads and Traffic system to promote safe, economic
and efficient movement of people and goods |
|
|
STRATEGY |
To maintain and develop the urban and rural road network |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Rural road sealed network to meet condition rating in accordance with
Councils adopted Road Hierarchy Policy and to achieve their design service
life |
Road Hierarchy Policy standards |
Annual Condition Assessment completed by February Hazard identification carried out in accordance with policy |
100% |
|
|
Implement a rolling program of pavement reconstruction/rehabilitation |
Program presented to Council for budget consideration |
100% |
|
|
Implement a 5 year rolling program of reseals |
Program presented to Council for budget consideration |
100% |
|
|
Control roadside vegetation |
Carryout works in accordance with policy |
100% |
|
|
Maintenance Management System |
Accomplishment reports generated. |
100% |
|
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
ROADS AND BRIDGES |
(continued)
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Rural gravel roads to provide acceptable riding qualities and safe
standards |
Road Hierarchy Policy standards |
Annual assessment of conditions by February Hazard identification carried out in accordance with policy |
100% |
|
|
Grade roads to maintain a surface which is drained and trafficable in
accordance with Council’s policy |
Length of road graded compared to programme |
100% |
|
|
Monitor condition of network |
Regular inspections carried out |
100% |
|
|
Control roadside vegetation |
Accomplishment recorded in Maintenance Management System. |
100% |
|
|
Carry out minor improvements (benching / widening) |
Locations identified by Supervisors. |
100% |
|
|
Monitor condition of network. |
Annual Condition Ratings Review completed by February |
100% |
|
|
Develop a rolling programme of pavement reconstruction |
Programme presented to Council for budget consideration |
100% |
|
|
Implement a Maintenance Management System |
Accomplishment reports generated |
100% |
|
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
ROADS AND BRIDGES |
(continued)
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Bridges maintained to ensure all bridges are safe, and structurally
capable of carrying out their design function |
Annual visual inspection program to determine condition. Rolling replacement program Load limits identified |
Preparation of an annual priority list by February 5 year upgrade program developed Complete bridge replacement program Load limits signposted |
100% 100% |
Prepared for next budget |
Extend the bitumen road network |
Construct projects from priority list in accordance with road
hierarchy and when funds are available Continually monitor traffic movement |
Submitted program completed Traffic counts |
10 0% |
|
Maintain conditions of Regional Roads |
Expend grants in accordance with the agreement with the Roads and
Traffic Authority |
Annual Condition Ratings Review. |
100% |
|
|
Maintenance Management System |
Accomplishment reports generated. |
100% |
|
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
FOOTPATHS |
|
|
OBJECTIVE |
Management of the roads and traffic system to promote safe, economic
and efficient movement of people and goods |
|
|
STRATEGY |
To maintain and extend the footpath network |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Render footpaths safe for use by pedestrians |
Carry out 6 monthly inspections of 25% of footpath network |
Inspections completed and details recorded in Maintenance Management
System. |
100% |
Inspections completed. Data being input into MMS. |
|
Prepare a list of reconstruction priorities |
Priorities presented to Council in conjunction with annual budget |
100% |
|
|
Maintenance programme to address damaged section and trips |
Progressive improvement o path network. |
100% |
|
|
Emergencies |
Respond within 24 hours |
100% |
|
Provide new footpaths in high usage areas |
Construct the adopted program |
List projects completed quarterly |
0% |
No projects in 2007/2008 |
Maintain footpaths within CBD areas in a clean and aesthetically pleasing
condition. |
Pressure clean footpaths once a year in Bowraville, Macksville and
Nambucca Heads CBD’s. |
Pressure cleaning completed in November |
100% |
|
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
PARKING AREAS |
|
|
OBJECTIVE |
Management of the roads and traffic system to promote safe, economic
and efficient movement of people and goods |
|
|
STRATEGY |
To provide carparking areas that are well maintained and adequate in
number |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide adequate number of spaces |
Ensure new developments provide required number of car spaces as per
Council’s off-street parking code. Prepare long term parking plan for Central Business areas. |
Carpark space numbers greater than or equal to Council’s off-street
parking code. Carparking strategy plan incorporated into a Section 94 contribution
plan. |
100% |
|
Provide clear identification of parking spaces in all off-street
parking areas |
Provide biannual remarking of lines and regular intermediate
inspections |
Complete no later than December biannually or as necessary |
100% |
|
Bitumen surface of carpark to be free of potholes and other surface
defects |
Provide maintenance program |
Pothole patch at least bimonthly Upgrade surface to hot-mix over 5 years |
100% |
|
Provide landscaping to a standard that does not attract adverse
community criticism |
Maintain landscaping |
Maintained twice a year by September and March. |
100% |
|
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
BUS STOP FACILITIES |
|
|
OBJECTIVE |
Management of the roads and traffic system to promote safe, economic
and efficient movement of people and goods |
|
|
STRATEGY |
To provide shelters to protect bus commuters from extreme weather and
provide bus standing areas clear of carriageway at school bus stops on Rural
sealed roads. |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Install shelters at all locations where the minimum number of
commuters is ten (10) |
Annual review based on statistics from bus operators. |
Minimum of two new shelters provided annually |
100% |
2 shelters purchased |
Provide bus standing areas clear of carriageway at all permanent
school bus stops on rural sealed roads |
Annual review based on locations from bus operators in January each
year |
Construct a minimum of one bus standing area annually |
0% |
RTA has not provided matching grants so no projects |
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
STREET LIGHTING |
|
|
OBJECTIVE |
Management of the roads and traffic system to promote safe, economic
and efficient movement of people and goods |
|
|
STRATEGY |
To provide the community with adequate street lighting in urban areas.
To provide safety and security for users of Council’s road network |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide lighting in accordance with AS 1158 |
Assess network deficiencies. |
Extra lights installed in accordance with Council’s goal of 5
additional lights in existing residential areas. |
100% |
5 submitted to Country Energy.
Still awaiting installation. |
|
Instruct local Power Authority to install approved street lights |
Lights in accordance with AS 1158 in new residential subdivision |
100% |
Country Energy liaise with Council |
PRINCIPAL ACTIVITY |
TRANSPORT AND COMMUNICATION |
|
|
FUNCTION |
BOAT RAMPS |
|
|
OBJECTIVE |
Provide and maintain recreation and leisure facilities on an equitable
basis across the shire |
|
|
STRATEGY |
That Council provide and maintain sufficient boat ramps to meet
community expectations |
RESPONSIBLE OFFICER |
Manager Civil Works |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Maintain ramps in operational condition |
Monthly inspection |
Inspection carried out and recorded in Maintenance Management System. |
100% |
|
|
Repair damage to concrete surface by August |
Maintenance completed by August |
50% |
Contractor engaged. |
|
Pressure clean ramps on a monthly basis |
Monthly cleaning completed and accomplishment recorded in Maintenance
Management System |
100% |
|
Provide new ramps or upgrade existing |
Obtain grants from Department Natural Resources, Department of Primary
Industries or NSW Maritime |
Grant application submitted for identified sites |
100% |
Grant obtained for |
PRINCIPAL ACTIVITY |
WATER SUPPLIES |
|
|
FUNCTION |
WATER |
|
|
OBJECTIVE |
To provide customers in urban areas with a cost effective, quality
water supply service at equitable charges, while providing for future needs
and protection of the environment |
|
|
STRATEGY |
To ensure the community has access to water supply that meets current
and future demand |
RESPONSIBLE OFFICER |
Manager Water and Sewerage |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide a cost effective water supply system at equitable charges |
Regular maintenance and improvements to the system |
Annual operating cost/connection are competitive in the Local
Government Comparators Average annual account / connection are competitive in the Local
Government Comparators |
100% |
|
Provide a quality water service |
Effective treatment and maintenance of the system Timely responses to emergencies |
100% compliance with Microbiological, chemical and Pesticide
Guidelines Staff arrive within 2 hours |
100% |
|
Provide for future growth |
Construction of new infrastructure that caters for growth |
New urban developments are able to be serviced. |
100% |
|
|
Construction of off-stream water storage |
Progress made against the Project Development Plan. |
95% |
Borefield investigation underway. |
PRINCIPAL ACTIVITY |
SEWERAGE |
|
|
FUNCTION |
SEWERAGE |
|
|
OBJECTIVE |
To provide customers in urban areas with a cost effective, quality
sewerage service at equitable charges, while providing for future needs and
protection of the environment |
|
|
STRATEGY |
To ensure that the community has a sewerage service that collects and
treats waste now and into the future |
RESPONSIBLE OFFICER |
Manager Water and Sewerage |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide a cost effective sewerage service at equitable charges |
Regular maintenance and improvements to the system |
Annual operating costs/connection are competitive in the Local
Government Comparators Average annual account/connection are competitive in the Local
Government Comparators |
100% |
|
Provide a quality sewerage service and protection of the environment |
Effective treatment and
maintenance of the system. Timely responses to emergencies |
100% compliance with EPA requirements and licence conditions Staff arrive within 2 hours |
100% |
|
Provide for future growth |
Construction of new infrastructure that caters for growth and changing
standards |
All new developments are able to be services. |
100% |
|
Special Meeting
of Ordinary Council - 27 August 2008 Quarterly Review -
Performance Targets Achievements to 30 June 2008 |
Attachment
1 18135/2008
- Quarterly Reviews - Performance Targets - to 30 June 2008 |
PRINCIPAL ACTIVITY |
PUBLIC ORDER AND SAFETY |
|
|
FUNCTION |
ANIMAL CONTROL |
|
|
OBJECTIVE |
Ensure compliance with Companion Animal
legislation for the protection of health and safety of the community |
|
|
STRATEGY |
Establish, implement and maintain measures to
ensure compliance with legislation within approved allocation of resources. |
RESPONSIBLE OFFICER |
Manager Health and Building Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Maintain a register under
the Companion Animal Legislation |
Ensure registrations in
accordance with the Companion Animal Legislation |
· On-going - surveillance
and checking of records |
100% |
|
Provide leash-free areas
in each of Nambucca Heads, Scotts Head, |
· Identify leash-free areas in Macksville; and Bowraville through
community consultation |
· Community consultation
undertaken by 31 December 2007 · Implement leash free
areas subject to budget allocation by 30 June 2008 |
· Areas established in
Nambucca Heads, Scotts Head & Valla. · Community consultation to
be undertaken in Macksville & Bowraville, during November 2007 |
|
Regulatory Officer
contract Review and advertise
Regulatory Officer’s contract position |
Review completed and new
contract entered into |
· Review completed and
endorsed by Council by 28 February 2007. · Tenders called March 2007 · New contract completed
and implemented from 8 May 2007. |
100% |
|
PRINCIPAL
ACTIVITY |
HEALTH |
|
|
FUNCTION |
PUBLIC HEALTH |
|
|
OBJECTIVE |
To maintain acceptable
public health standards within the community |
|
|
STRATEGY |
Provide services to
level of community expectations within approved budget and approved budget
and available resources |
RESPONSIBLE OFFICER |
Manager Health and
Building Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
All registered on-site
sewage management systems (OSMS) to have approvals to operate (ATO) issued |
Assess and/or inspect and
issue approvals for operation of new on-site sewage management systems. |
· Assessments for new OSMS, undertaken and approvals issued within 40
days · Inspect existing OSMS within 40 days of expiry of ATO |
99% 99% |
Reduced staff levels |
Operating license
renewals sent one month before license due. |
· 100% of license renewal notices issued one month prior to license
expiry date |
|
|
|
Review On-Site Sewage
Management Plan |
Available resources to
undertake review |
· Annual review completed by October each year. |
80% |
Review of document
completed – report to Council September 2008 |
Issue approvals under
Section 68 of the LGA 1993 for skin penetration, body piercing, hairdressing
businesses |
· Inspect, assess and issue 5 year ATO’s · Keep register of all premises within Shire |
· Carry out annual inspection to ensure compliance with Public Health
standards |
100% |
|
PRINCIPAL
ACTIVITY |
HEALTH |
|
|
FUNCTION |
IMMUNISATION |
|
|
OBJECTIVE |
To maintain and provide
immunisation records (up to 1999). |
|
|
STRATEGY |
To ensure safe keeping
of immunisation records for public access as required. |
RESPONSIBLE OFFICER |
Manager Health and
Building Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide clients with
copies of immunisation records held by Council within 14 days |
Maintain a system for
effective issue of records |
100% issued within 14 days |
100% |
|
PRINCIPAL
ACTIVITY |
HEALTH |
|
|
FUNCTION |
FOOD CONTROL AND
INSPECTION |
|
|
OBJECTIVE |
To maintain acceptable
public health standards for food premises |
|
|
STRATEGY |
Ensure adequate
surveillance of food premises within allocated resources |
RESPONSIBLE OFFICER |
Manager Health and
Building Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Inspect and record all
food premises annually |
Maintain a regular
inspection program |
100% of premises inspected annually |
100% |
|
Assist with public
education and compliance issues relating to food handling, preparation and
storage |
Outline details and
direct access to construction standards, food safety standards and Australian
Standards relating to food and food premises |
Response
provided within 14 days of request or enquiry |
Ongoing |
|
Inspect and issue 5 year
approval for mobile food vending and water transport vehicles |
Carry out annual
inspections of vehicles, as required by operating licence |
Vehicles inspected within 30 days of approval
date anniversary |
100% |
|
PRINCIPAL ACTIVITY |
COMMUNITY SERVICES AND EDUCATION |
|
|
FUNCTION |
COMMUNITY SERVICES |
|
|
OBJECTIVE |
To promote and provide for the social well-being
of the community |
|
|
STRATEGY |
Provision of community services and facilities. |
RESPONSIBLE OFFICER |
Manager Community and Cultural Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide special programs
for seniors |
Provide funding for
Seniors Week activities |
Seniors Week is conducted
in accordance with Council’s approved program and allocated budget |
100% |
|
Undertake community
planning which takes into account the needs of older people |
Employment of a Community
Worker in partnership with the Department of Ageing, Disability and Home Care |
The project is conducted
in accordance with the terms and conditions of the Funding Agreement and the
following are submitted by mid-Oct 2007 · Report on Achievements · 2007-08 Workplan · Income and Expenditure Statement · Annual Return |
100% |
|
PRINCIPAL ACTIVITY |
COMMUNITY SERVICES AND EDUCATION |
|
|
FUNCTION |
COMMUNITY SERVICES |
|
|
OBJECTIVE |
To promote and provide for the social well-being
of the community |
|
|
STRATEGY |
Provision of community services and facilities.. |
RESPONSIBLE OFFICER |
Manager Community and Cultural Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Provide special
programs for young people |
Co-ordinate and
provide funding for Youth Week activities |
Youth Week is
conducted in accordance with Council’s approved program and allocated budget |
100% |
|
Manage funding
provided by the Department of Community Services for employment of a Youth
Development Officer and Youth Worker |
The projects are
conducted in accordance with the terms and conditions of the Funding
Agreement: · Income/expenditure statements, Annual Report on
Achievements submitted by 30 September 2007 · Service Specifications developed by March 2008 |
100% |
Annual reporting
requirements completed |
|
Delivery of a
range of human services and provision of community facilities to meet
community expectations in partnership with the community. |
Administration of
North Coast Area Assistance Scheme in partnership with the Department of
Community Services |
· Funding submissions are assessed and ranked
according to the AAS guidelines. · Deadlines on the AAS timetable are met |
100% |
|
Contribute to
the provision of a community facility for Nambucca Heads and surrounds |
Provide
financial assistance for rent for Community Centre in |
· Council contributes |
100% |
|
Consult and seek
advice from the community regarding community service needs |
Resource
Council’s Community Services Committee to provide a range of advisory
services |
· The committee meets according to its constitution
(ie at least quarterly). |
100% |
|
PRINCIPAL ACTIVITY |
COMMUNITY SERVICES AND EDUCATION |
|
|
FUNCTION |
COMMUNITY SERVICES |
|
|
OBJECTIVE |
To promote and provide for the social well-being
of the community |
|
|
STRATEGY |
Provision of community services and facilities. |
RESPONSIBLE OFFICER |
Manager Community and Cultural Services |
PERFORMANCE TARGET |
MEANS OF ACHIEVING TARGET |
PERFORMANCE INDICATORS |
EXTENT ACHIEVED |
REASON FOR VARIATION |
Implement adopted Crime
Prevention Plan |
Projects/programs are
identified and implemented |
· Funded programs are completed by June 2008 |
0% |
· No funds allocated in 07/08 budget |
Contribute to the
services assisting people in the rural sector |
Financial support for the
Rural Financial Counselling Service |
· Council contributes $3,800 per year · That the support provided by the service be reported to Council
annually |
100% |
|
Deliver services
appropriate to the needs of the Aboriginal and Torres Strait Islander
community |
Resource Council’s
Aboriginal Community Advisory Committee to provide a range of advisory
services |
· The committee meets according to its constitution (ie at least
quarterly). |
100% |
|
Manage funding provided
by Department of Community Services for Community Worker (Aboriginal) |
The projects are conducted
in accordance with the terms and conditions of the Funding Agreement: · Income/expenditure statements, Annual Report on Achievements submitted
by 30 September 2007 · Service Specifications developed by March 2008 |
100% |