Waste Facility Environmental Compliance

WASTE MANAGEMENT – ENVIRONMENTAL COMPLIANCE

Changes to the environmental protection legislation as a result of the Protection of the Environment Legislation Amendment Act 2011 requires all local Councils to publish groundwater, surface water, leachate and landfill gas monitoring data from each of their landfill sites from 1 July 2012.
Nambucca Council currently operates two sites adjacent to each other within the LGA being a landfill and transfer station.

Licensed Facility:  Nambucca Waste Management Facility
Environment Protection Licence:  No 11386 (Landfill) & No 6268 (Transfer Station)
Facilities Address:  711 Old Coast Road Nambucca Heads
Licensee's Name:  Nambucca Valley Council
Licensee's Address:  PO Box 177, Macksville NSW 2447

The link provided below will take you to the Office of Environment and Heritage website, where you can search for each licence by entering the licence number. Full licence details and past annual returns can be viewed online.

http://www.environment.nsw.gov.au/prpoeoapp/

 
 
Environment Protection Licence: 11386 (Landfill)

The tables below identify the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for annual, bi-annual and quarterly sampling with the licence anniversary date being 1 March.

Note: If N/A is indicated it means that at the time of sampling no water or probe readings were available.

NNLF-1 Bore Hole (Quarterly Sampling)

 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
pH
21.06.22 183 0.06 0.028 0.174 0.22 0.98 0.76 1.5 17.2 6.4
07.07.22 25 <0.02 0.020 0.112 <0.02 0.60 0.06 1.7 20.5 6.4
                     
                     



NNLF-2 Bore Hole (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Tempurature
oC
pH
21.06.22 34 0.24 0.029 0.218 <0.02 0.77 0.77 1.3 15.7 5.6
07.07.22 4 <0.02 0.017 0.055 0.05 0.56 0.49 0.87 20.4 5.8
                     
                     







NNLF-6 Gas Monitoring (Methane Bi-Annual)
 
Date Gatehouse
(% v/v)
Machinery Shed
(% v/v)
House @ Hi-Tec Concrete
(% v/v)
Shed@ Hi-Tec Concrete
(% v/v)
Work Shed @ Hi-Tec
Concrete (% v/v)
03.06.22 0 0 0 0 0
           



NNLF-7 Gas Monitoring (Methane Bi-Annual)
 
Date Stage One - Cell One
(% v/v)
Stage One - Cell Two
(% v/v)
03.06.22 0 0
     



NNLF-8 Gas Monitoring (Methane Bi-Annual)
 
Date Bore Hole 1
(% v/v)
Bore Hole 2
(% v/v)
Bore Hole 12
(% v/v)
Bore Hole 13
(% v/v)
03.06.22 0 0 0 0
         


 
 
NNLF-9 Surface Water (Bi-annual Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Arsenic
(mg/L)
BOD
(mg/L)
Boron
(mg/L)
Calcium
(mg/L)
Chloride
(mg/L)
Chromium (mg/L) Conductivity
(mS/cm)
Dissolved oxygen
(mg/L)
Fluoride
(mg/L)
Iron
(mg/L)
Lead
(mg/L)
Magnesium
(mg/L)
Manganese
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Phosphorus
(mg/L)
Potassium
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Temperature
oC
Total Phenolics
(mg/L)
TOC
 (mg/L)
Zinc
(mg/L)
pH
                                                       
                                                       
 
NNLF-12 Bore Hole (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
pH
21.06.22 215 <0.02 0.031 0.122 0.08 0.46 0.38 3.1 7.6 6.5
07.07.22 43 1.61 0.041 0.172 0.11 2.08 1.94 2.4 21.2 7.5
                     
                     


NNLF-13 Bore Hole (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
pH
21.06.22 84 0.33 0.042 0.208 0.04 1.31 1.27 5.3 21.2 5.9
07.07.22 70 3.01 0.086 0.0325 0.03 6.48 6.43 6.0 21 7.2
                     
                     


The table below identifies the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for special frequency (1 and 2) sampling for the first rainfall event in each quarter that exceeds 30mm in 24 hours.

NNLF-3 Surface Water (Quarterly Sampling)

 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
Total Suspended Solids
(mg/L)
Dissolved Oxygen
(mg/L)
pH
24.05.22 11 0.03 0.021 0.121 0.05 0.52 0.47 1.2 20.2 7 8.5 6.1
06.07.22 4 <0.02 0.015 0.030 0.08 0.68 0.60 0.93 19.6 35 9.3 5.7
                         
                         


NNLF-4 Surface Water (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)


Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)


Temperature
oC
Total Suspended Solids
(mg/L)

Dissolved Oxygen
(mg/L)

 

pH
24.05.22 62 0.35 0.030 0.198 0.07 1.01 0.94 3.7 20.2 89 8.0 6.1
06.07.22 31 0.08 0.023 0.100 0.14 1.14 1.00 2.8 19.3 336 9.2 7.4
                         
                         



NNLF-5 Surface Water (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)

Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)

Temperature
oC
Total Suspended Solids
(mg/L)
Dissolved Oxygen
(mg/L)
pH
24.05.22 57 0.35 0.029 0.193 0.05 0.94 0.89 3.4
20.1
5 6.1 6.9
06.07.22 26 0.09 0.029 0.102 0.17 0.76 0.59 2.6 19.4 33 9.4 7.3
                         
                         



NNLF-11 Surface Water (Quarterly Sampling)
 
Date pH Total Suspended Solids
(mg/L)
24.05.22 6.0 7
06.07.22 6.6 1610
     
     

NNLF-5 Surface Water (Wetland outlet pipe during overflows up to 74mm rain)

Date pH Total Suspended Solids
(mg/L)
Rainfall  
01.03.22 N/A N/A 96mm
Exceed rainfall
         
07.03.22 Missed Missed 28mm  
08.03.22 N/A N/A 84mm
Exceed rainfall
         
24.03.22 Missed Missed 15mm  
25.03.22 Missed Missed 11mm  
26.03.22 N/A N/A 57mm
Exceed rainfall
         
29.03.22 7.3 7 29mm  
30.03.22 N/A N/A 176mm
Exceed rainfall
         
08.04.22 Missed Missed 18mm  
09.04.22 Missed Missed 26mm  
10.04.22 Missed Missed 5mm  
         
23.04.22 Missed Missed 37mm  
24.04.22 Missed Missed 12mm  
25.04.22 Missed Missed 6mm  
26.04.22 Missed Missed 19mm  
27.04.22 Missed Missed 1mm  
28.04.22 Missed Missed 11mm  
         
12.05.22 Missed Missed 25mm  
13.05.22 Missed Missed 25mm  
14.05.22 Missed Missed 32mm Exceed rainfall
         
21.05.22 Missed Missed 11mm  
22.05.22 Missed Missed 29mm  
23.05.22 Missed Missed 35mm  
24.05.22 6.9 10 5mm Exceed rainfall
25.05.22 6.9 5 5.5mm  
         
06.07.22 6.6 1610 140mm Exceed rainfall
         
         
         
         
         
         
         
         
         
         
         
         

Environment Protection Licence: 6268 (Transfer Station)

The table below identifies the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for annual, bi-annual and quarterly sampling with the licence anniversary date being 18 September.

Note: If N/A is indicated it means that at the time of sampling no water or probe readings were available.


NLF-1 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 0.03 <0.012 5.5 0.06 6.4 3.1 1.29 0.67 18.1 6.7 <0.002 0.8


NLF-2 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A


NLF-3 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Standing Water Level
14.10.21 0.93 <0.012 6.3 0.02 6.6 1.6 2.62 0.03 17.6 20 0.9

NLF-4 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A


NLF-5 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 1.41 0.047 6.1 0.13 5.9 1.5 9.75 4.88 17.6 130 0.014 1.1


NLF-6a Bore Hole (Annual Sampling)
 
  Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Standing Water Level Total Kjeldahl Nitrogen
(mg/L)
14.10.21 0.04 0.071 8.8 0.31 5.8 8.6 4.5 0.18 18.8 55 2.1 Missed
                             


NLF-8 Bore Hole (Annual Sampling)
 
  Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 0.15 <0.012 5.4 0.02 6.4 3.5 3.71 0.54 19 21 <0.002 1
                             



NLF-9 Bore Hole (Annual Sampling)

 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 0.08 <0.012 7.3 0.06 6.3 1.4 1.22 1.51 17.7 7.5 <0.002 1.2


NLF-10 Surface Water (Quarterly Sampling)
 
  Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Total Suspended Solids
(mg/L)
Zinc
(mg/L)
12.10.21 0.21 <0.012 7.9 0.35 7 5.2 1.52 0.09 18.9 10 44 0.036
01.12.21 0.25 <0.012 4.3 <0.02 7 6.6 1.15 0.05 15.7 14 8 0.006
28.03.22 1.21 0.015 2.9 <0.02 6.9 4 1.91 0.1 20.8 12 16 0.013
06.07.22 1.25 <0.012 8.0 0.74 6.6 4.1 2.58 0.06 19.2 7.0 60 0.037
                           


NLF-11 Surface Water (Quarterly Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Total Suspended Solids
(mg/L)
Zinc
(mg/L)
12.10.21 0.03 <0.012 8.6 0.1 6.9 3 0.99 0.04 19.3 15 63 0.012
01.12.21 0.02 <0.012 8.7 0.02 6.9 3.6 0.77 0.04 16.1 15 43 0.013
28.03.22 1.22 <0.012 7.1 <0.02 6.9 2.2 1.23 0.05 20.9 19 5 0.008
06.07.22 <0.02 <0.012 9.6 0.25 6.3 1.1 0.82 0.03 19.4 7.2 30 0.007

NLF-12 Surface Water (Quarterly Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Total Suspended Solids
(mg/L)
Zinc
(mg/L)
12.10.21 0.06 <0.012 7.6 0.18 7.3 7.3 1.35 0.06 7.3 15 41 0.01
01.12.21 <0.02 0.012 6.9 <0.02 7.1 3.5 0.84 0.04 16.1 20 18 0.009
28.03.22 0.09 <0.012 5.8 0.02 7.2 2.9 0.8 0.06 20.8 16 30 0.009
06.07.22 0.02 <0.012 9.2 0.09 7.3 2.4 0.95 0.09 19.7 12 266 0.034


NLF-13 Surface Water (Bi-Annual)
 
Date Ammonia
(mg/L)
Biochemical Oxygen Demand
(mg/L)
Calcium
(mg/L)
Chloride
(mg/L)
Iron
(mg/L)
Magnesium
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Total Organic Carbon
(mg/L)
03.11.21 17.7 5 53 263 14.4 27 0.4 6.7 13 160 39 18.3 0.04 18
23.05.22 12.9 4 32 84 14.1 13 0.08 6.8 10 6.1 6.7 13.4 0.11 32

NLF-14 Gas Monitoring (Methane Bi-Annual)

 
Date Gatehouse
(%v/v)
Machinery Shed
(%v/v)
House @ Hi-Tec Concrete
(%v/v)
Shed
(%v/v)
Work Shed @ Hi-Tec Concrete
(%v/v)
13/12/2021 0 0 0 0 0
03/06/2022 0 0 0 0 0


NLF-15 Gas Monitoring (Methane Bi-Annual)
 
Date Eastern Side of Waste Area
(%v/v)
Western Side of Waste Area
(%v/v)
13/12/2021 0 0
03/06/2022 0 0


NLF-16 Gas Monitoring (Methane Bi-Annual)
 
Date Bore Hole 1
(%v/v)
Bore Hole 2
(%v/v)
Bore Hole 3
(%v/v)
Bore Hole 4
(%v/v)
Bore Hole 5
(%v/v)
Bore Hole 6a
(%v/v)
Bore Hole 8
(%v/v)
Bore Hole 9
(%v/v)
13/12/2021 0 0 0 0 0 0 0 0
03/06/2022 0 0 0 0 0 0 0 0



The table below identifies the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for special frequency (1) sampling for the first four rainfalls events that occur after the licence anniversary (18 September) that exceeds 20mm in 24 hours.

NLF–10
Date Rainfall Ph Total Suspended Solids
(mg/L)
12/10/2021 38mm 7 44
31/10/2021 31mm 7.1 13
12/11/2021 21.5mm 6.9 11
22/11/2021 31mm 7 29

The table below identifies the environmental monitoring and testing schedule and sampling results as indicated in the Environmental Protection Licence for the strategy for overflow sampling.

Pump No 2
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium
(mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
(mg/L)
Total Dissolved     Solids
(mg/l)
Conductivity (Us/cm)    
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 3.91 4.55 10.9   22 6   397 621
14/10/2021 14 5.08 0.54 8.26   17 6.1   355 555
18/10/2021 0 13.3 <0.02 14.6   45 6.4   686 1070
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 13.5 <0.02 13.5   28 6.3   474 741
30/11/2021 0 13.5 <0.02 13.5   31 6.3   465 727
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 N/A N/A N/A   N/A N/A   N/A N/A
7/02/2022 8 N/A N/A N/A   N/A N/A   N/A N/A
                     
24/02/2022 34 8.2 <0.05 8.2   30 6.4   340 532
25/02/2022 76 6.3 <0.05 6.3   12 6.4   325 508
28/02/2022 82 3.9 <0.05 3.9   28 6.3   205 320
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 8.15 0.05 9.36   16 6.4   369 577
29/03/2022 29 9.37 <0.02 10.5   17 6.4   370 578
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 3.57 1.46 6.55 5.1 474 6.2
8.6
177 276
07.07.22 83 4.94 0.06 5.39 5.6 31 6.1 12 258 403

NLF–13
 
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium
(mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
(mg/L)

Total Dissolved Solids  (mg/l)

Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021
112
11.9 4.32 19.4   69
6.4
 
540

843
                     
25/11/2021 22 6.41 <0.02 6.42   12
6.3
 
331

516
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 12.7 0.05 13   38 6.5   418 654
                     
24/02/2022 34 13.4 <0.05 13.4   68 6.8   482
 
753
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 11.5 0.03 12.7   40 6.5   391 610

 
                   
4th Quarter
(June – Aug)
                   
06.07.22 140 14.8 0.81 15.9 10 87 6.5 13 406 635
NLF–10
Date Rainfall
(mm)
Spillway Depth
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium
(mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon (mg/L)

Total Dissolved Solids (mg/l)

Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                     
13/10/2021 112 10
0.2

0.33

1.45
  45 7   227 355
14/10/2021 14 0
1.05

0.62

2.91
  23 6.7   283 442
18/10/2021 0 0
0.7

0.09

1.69
  7 6.9   370 577
                       
25/11/2021 22 0 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 10 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 5 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0 0.19 <0.02 1.11   14 6.9   304 474
30/11/2021 0 0 0.17 <0.02 1.09   13 6.9   297 464
1/12/2021 33 0 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 0 N/A N/A N/A   N/A N/A   N/A N/A
                       
2nd Quarter
(Dec – Feb)
                     
3/02/2022 52 N/A 0.2 <0.02 1.37   11 7   342 534
7/02/2022 8 N/A 0.66 <0.02 1.66   11 6.9   314 491
                       
24/02/2022 34 N/A 0.21 <0.05 0.81   30 7.1   201 314
25/02/2022 76 N/A 0.11 <0.05 0.64   12 7.3   148 231
28/02/2022 82 N/A 1.03 <0.05 1.15   22 6.6   120 187
                       
3rd Quarter
(March – May)
                     
28/03/2022 19 N/A 1.24 <0.02 1.89   19 6.9   184 288
29/03/2022 29 N/A 0.85 0.03 1.42   25 7.1   167 261
                       
4th Quarter
(June – Aug)
                     
06.07.22 140 30 0.17 0.64 1.34 4.8 26 7.0 8.4 194 304
07.07.22 83 5 0.02 0.16 0.72 1.2 8 6.1 13 39 61
















NLF–11
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium (mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
 (mg/L)

Total Dissolved Solids (mg/l)

Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 0.03 0.1 0.99   60 6.8   130 203
14/10/2021 14 0.18 0.1 0.99   13 6.6   154 241
18/10/2021 0 0.17 0.03 0.68   9 6.7   223 349
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0.08 <0.02 0.62   5 6.9   150 234
30/11/2021 0 0.09 0.02 0.71   22 6.8   150 234
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 0.02 0.03 0.78   24 7   98 153
7/02/2022 8 0.08 <0.02 0.65   2 6.8   160 249
                     
24/02/2022 34 0.08 <0.05 0.5   50 6.7   74 116
25/02/2022 76 0.05 <0.05 0.46   7 6.8   83 130
28/02/2022 82 <0.05 <0.05 0.37   14 6.2   29 46
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 0.63 <0.02 1.16   5 6.9   94 148
29/03/2022 29 0.52 <0.02 1.06   31 6.9   78 122
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 0.02 0.23 0.79 1.3 46 6.4 11 26 40
07.07.22 83 0.13 0.07 0.79 1.7 12 6.7 12 71 110



















PRP–1
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium (mg/L)
 
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
 (mg/L)
Total Dissolved Solids (mg/l) Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 0.02 0.1 1.07   70 6.8   140 218
14/10/2021 14 0.1 0.14 0.98   12 6.6   173 271
18/10/2021 0 <0.02 0.03 0.56   6 6.5   289 452
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0.04 0.02 0.58   6 6.8   174 272
30/11/2021 0 0.05 <0.02 0.57   5 6.8   172 269
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 0.02 0.02 0.74   19 7   107 167
7/02/2022 8 0.07 <0.02 `0.61   4 6.9   174 271
                     
24/02/2022 34 <0.05 <0.05 0.57   34 6.4   62 96
25/02/2022 76 <0.05 <0.05 0.41   4 6.7   87 136
28/02/2022 82 <0.05 <0.05 0.36   20 6.4   40 62
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 0.58 <0.02 1.16   7 6.8   98 153
29/03/2022 29 0.65 <0.02 1.2   34 6.9   84 131
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 0.02 0.26 0.96 1.2 58 6.3 11 22 35
07.07.22 83 0.06 0.14 0.75 1.7 26 6.6 8.8 54 84


















NLF–12
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium (mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
(mg/L)
Total Dissolved Solids (mg/l) Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 0.06 0.18 1.35   42 7.3   206 323
14/10/2021 14 0.07 0.2 1.61   22 7.1   185 290
18/10/2021 0 0.08 0.03 1.1   99 7.2   219 342
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0.02 <0.02 1.01   7 7.2   195 305
30/11/2021 0 <0.02 <0.02 0.88   26 7   144 225
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb0)
                   
3/02/2022
52
<0.02 <0.02 0.97   17 7.1   150 234
7/02/2022
8
<0.02 <0.02 1.01   10 7.2   182 284
                     
24/02/2022 34 <0.02 <0.02 0.66   31 6.9   118 185
25/02/2022 76 0.05 <0.02 0.63   19 7.1   118 184
28/02/2022 82 0.03 <0.02 0.42   124 7.1   55 86
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 0.08 0.04 0.76   18 7.1   125 195
29/03/2022 29 0.04 0.03 0.8   29 7   121 189
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 2.12 0.13 2.81 2.6 29 7.1 6.1 152 238
07.07.22 83 0.38 0.05 1.31 1.8 12 6.6 16 80 125
WASTE MANAGEMENT – ENVIRONMENTAL COMPLIANCE

Changes to the environmental protection legislation as a result of the Protection of the Environment Legislation Amendment Act 2011 requires all local Councils to publish groundwater, surface water, leachate and landfill gas monitoring data from each of their landfill sites from 1 July 2012.
Nambucca Council currently operates two sites adjacent to each other within the LGA being a landfill and transfer station.

Licensed Facility:  Nambucca Waste Management Facility
Environment Protection Licence:  No 11386 (Landfill) & No 6268 (Transfer Station)
Facilities Address:  711 Old Coast Road Nambucca Heads
Licensee's Name:  Nambucca Valley Council
Licensee's Address:  PO Box 177, Macksville NSW 2447

The link provided below will take you to the Office of Environment and Heritage website, where you can search for each licence by entering the licence number. Full licence details and past annual returns can be viewed online.

http://www.environment.nsw.gov.au/prpoeoapp/

 
 
Environment Protection Licence: 11386 (Landfill)

The tables below identify the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for annual, bi-annual and quarterly sampling with the licence anniversary date being 1 March.

Note: If N/A is indicated it means that at the time of sampling no water or probe readings were available.

NNLF-1 Bore Hole (Quarterly Sampling)

 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
pH
21.06.22 183 0.06 0.028 0.174 0.22 0.98 0.76 1.5 17.2 6.4
07.07.22 25 <0.02 0.020 0.112 <0.02 0.60 0.06 1.7 20.5 6.4
                     
                     



NNLF-2 Bore Hole (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Tempurature
oC
pH
21.06.22 34 0.24 0.029 0.218 <0.02 0.77 0.77 1.3 15.7 5.6
07.07.22 4 <0.02 0.017 0.055 0.05 0.56 0.49 0.87 20.4 5.8
                     
                     







NNLF-6 Gas Monitoring (Methane Bi-Annual)
 
Date Gatehouse
(% v/v)
Machinery Shed
(% v/v)
House @ Hi-Tec Concrete
(% v/v)
Shed@ Hi-Tec Concrete
(% v/v)
Work Shed @ Hi-Tec
Concrete (% v/v)
03.06.22 0 0 0 0 0
           



NNLF-7 Gas Monitoring (Methane Bi-Annual)
 
Date Stage One - Cell One
(% v/v)
Stage One - Cell Two
(% v/v)
03.06.22 0 0
     



NNLF-8 Gas Monitoring (Methane Bi-Annual)
 
Date Bore Hole 1
(% v/v)
Bore Hole 2
(% v/v)
Bore Hole 12
(% v/v)
Bore Hole 13
(% v/v)
03.06.22 0 0 0 0
         


 
 
NNLF-9 Surface Water (Bi-annual Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Arsenic
(mg/L)
BOD
(mg/L)
Boron
(mg/L)
Calcium
(mg/L)
Chloride
(mg/L)
Chromium (mg/L) Conductivity
(mS/cm)
Dissolved oxygen
(mg/L)
Fluoride
(mg/L)
Iron
(mg/L)
Lead
(mg/L)
Magnesium
(mg/L)
Manganese
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Phosphorus
(mg/L)
Potassium
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Temperature
oC
Total Phenolics
(mg/L)
TOC
 (mg/L)
Zinc
(mg/L)
pH
                                                       
                                                       
 
NNLF-12 Bore Hole (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
pH
21.06.22 215 <0.02 0.031 0.122 0.08 0.46 0.38 3.1 7.6 6.5
07.07.22 43 1.61 0.041 0.172 0.11 2.08 1.94 2.4 21.2 7.5
                     
                     


NNLF-13 Bore Hole (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
pH
21.06.22 84 0.33 0.042 0.208 0.04 1.31 1.27 5.3 21.2 5.9
07.07.22 70 3.01 0.086 0.0325 0.03 6.48 6.43 6.0 21 7.2
                     
                     


The table below identifies the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for special frequency (1 and 2) sampling for the first rainfall event in each quarter that exceeds 30mm in 24 hours.

NNLF-3 Surface Water (Quarterly Sampling)

 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)
Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)
Temperature
oC
Total Suspended Solids
(mg/L)
Dissolved Oxygen
(mg/L)
pH
24.05.22 11 0.03 0.021 0.121 0.05 0.52 0.47 1.2 20.2 7 8.5 6.1
06.07.22 4 <0.02 0.015 0.030 0.08 0.68 0.60 0.93 19.6 35 9.3 5.7
                         
                         


NNLF-4 Surface Water (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)


Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)


Temperature
oC
Total Suspended Solids
(mg/L)

Dissolved Oxygen
(mg/L)

 

pH
24.05.22 62 0.35 0.030 0.198 0.07 1.01 0.94 3.7 20.2 89 8.0 6.1
06.07.22 31 0.08 0.023 0.100 0.14 1.14 1.00 2.8 19.3 336 9.2 7.4
                         
                         



NNLF-5 Surface Water (Quarterly Sampling)
 
Date Alkalinity
(mg/L)
Ammonia
(mg/L)
Boron
(mg/L)

Conductivity
(mS/cm)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)
Total Kjeldahl Nitrogen
(mg/L)
Potassium
(mg/L)

Temperature
oC
Total Suspended Solids
(mg/L)
Dissolved Oxygen
(mg/L)
pH
24.05.22 57 0.35 0.029 0.193 0.05 0.94 0.89 3.4
20.1
5 6.1 6.9
06.07.22 26 0.09 0.029 0.102 0.17 0.76 0.59 2.6 19.4 33 9.4 7.3
                         
                         



NNLF-11 Surface Water (Quarterly Sampling)
 
Date pH Total Suspended Solids
(mg/L)
24.05.22 6.0 7
06.07.22 6.6 1610
     
     

NNLF-5 Surface Water (Wetland outlet pipe during overflows up to 74mm rain)

Date pH Total Suspended Solids
(mg/L)
Rainfall  
01.03.22 N/A N/A 96mm
Exceed rainfall
         
07.03.22 Missed Missed 28mm  
08.03.22 N/A N/A 84mm
Exceed rainfall
         
24.03.22 Missed Missed 15mm  
25.03.22 Missed Missed 11mm  
26.03.22 N/A N/A 57mm
Exceed rainfall
         
29.03.22 7.3 7 29mm  
30.03.22 N/A N/A 176mm
Exceed rainfall
         
08.04.22 Missed Missed 18mm  
09.04.22 Missed Missed 26mm  
10.04.22 Missed Missed 5mm  
         
23.04.22 Missed Missed 37mm  
24.04.22 Missed Missed 12mm  
25.04.22 Missed Missed 6mm  
26.04.22 Missed Missed 19mm  
27.04.22 Missed Missed 1mm  
28.04.22 Missed Missed 11mm  
         
12.05.22 Missed Missed 25mm  
13.05.22 Missed Missed 25mm  
14.05.22 Missed Missed 32mm Exceed rainfall
         
21.05.22 Missed Missed 11mm  
22.05.22 Missed Missed 29mm  
23.05.22 Missed Missed 35mm  
24.05.22 6.9 10 5mm Exceed rainfall
25.05.22 6.9 5 5.5mm  
         
06.07.22 6.6 1610 140mm Exceed rainfall
         
         
         
         
         
         
         
         
         
         
         
         

Environment Protection Licence: 6268 (Transfer Station)

The table below identifies the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for annual, bi-annual and quarterly sampling with the licence anniversary date being 18 September.

Note: If N/A is indicated it means that at the time of sampling no water or probe readings were available.


NLF-1 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 0.03 <0.012 5.5 0.06 6.4 3.1 1.29 0.67 18.1 6.7 <0.002 0.8


NLF-2 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A


NLF-3 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Standing Water Level
14.10.21 0.93 <0.012 6.3 0.02 6.6 1.6 2.62 0.03 17.6 20 0.9

NLF-4 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A


NLF-5 Bore Hole (Annual Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 1.41 0.047 6.1 0.13 5.9 1.5 9.75 4.88 17.6 130 0.014 1.1


NLF-6a Bore Hole (Annual Sampling)
 
  Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Standing Water Level Total Kjeldahl Nitrogen
(mg/L)
14.10.21 0.04 0.071 8.8 0.31 5.8 8.6 4.5 0.18 18.8 55 2.1 Missed
                             


NLF-8 Bore Hole (Annual Sampling)
 
  Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 0.15 <0.012 5.4 0.02 6.4 3.5 3.71 0.54 19 21 <0.002 1
                             



NLF-9 Bore Hole (Annual Sampling)

 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Zinc
(mg/L)
Standing Water Level
14.10.21 0.08 <0.012 7.3 0.06 6.3 1.4 1.22 1.51 17.7 7.5 <0.002 1.2


NLF-10 Surface Water (Quarterly Sampling)
 
  Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Total Suspended Solids
(mg/L)
Zinc
(mg/L)
12.10.21 0.21 <0.012 7.9 0.35 7 5.2 1.52 0.09 18.9 10 44 0.036
01.12.21 0.25 <0.012 4.3 <0.02 7 6.6 1.15 0.05 15.7 14 8 0.006
28.03.22 1.21 0.015 2.9 <0.02 6.9 4 1.91 0.1 20.8 12 16 0.013
06.07.22 1.25 <0.012 8.0 0.74 6.6 4.1 2.58 0.06 19.2 7.0 60 0.037
                           


NLF-11 Surface Water (Quarterly Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Total Suspended Solids
(mg/L)
Zinc
(mg/L)
12.10.21 0.03 <0.012 8.6 0.1 6.9 3 0.99 0.04 19.3 15 63 0.012
01.12.21 0.02 <0.012 8.7 0.02 6.9 3.6 0.77 0.04 16.1 15 43 0.013
28.03.22 1.22 <0.012 7.1 <0.02 6.9 2.2 1.23 0.05 20.9 19 5 0.008
06.07.22 <0.02 <0.012 9.6 0.25 6.3 1.1 0.82 0.03 19.4 7.2 30 0.007

NLF-12 Surface Water (Quarterly Sampling)
 
Date Ammonia
(mg/L)
Arsenic
(mg/L)
Dissolved Oxygen
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Temperature
oC
Total Organic Carbon
(mg/L)
Total Suspended Solids
(mg/L)
Zinc
(mg/L)
12.10.21 0.06 <0.012 7.6 0.18 7.3 7.3 1.35 0.06 7.3 15 41 0.01
01.12.21 <0.02 0.012 6.9 <0.02 7.1 3.5 0.84 0.04 16.1 20 18 0.009
28.03.22 0.09 <0.012 5.8 0.02 7.2 2.9 0.8 0.06 20.8 16 30 0.009
06.07.22 0.02 <0.012 9.2 0.09 7.3 2.4 0.95 0.09 19.7 12 266 0.034


NLF-13 Surface Water (Bi-Annual)
 
Date Ammonia
(mg/L)
Biochemical Oxygen Demand
(mg/L)
Calcium
(mg/L)
Chloride
(mg/L)
Iron
(mg/L)
Magnesium
(mg/L)
Nitrate
(mg/L)
Ph Potassium
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Total Nitrogen
(mg/L)
Total Phosphorus
(mg/L)
Total Organic Carbon
(mg/L)
03.11.21 17.7 5 53 263 14.4 27 0.4 6.7 13 160 39 18.3 0.04 18
23.05.22 12.9 4 32 84 14.1 13 0.08 6.8 10 6.1 6.7 13.4 0.11 32

NLF-14 Gas Monitoring (Methane Bi-Annual)

 
Date Gatehouse
(%v/v)
Machinery Shed
(%v/v)
House @ Hi-Tec Concrete
(%v/v)
Shed
(%v/v)
Work Shed @ Hi-Tec Concrete
(%v/v)
13/12/2021 0 0 0 0 0
03/06/2022 0 0 0 0 0


NLF-15 Gas Monitoring (Methane Bi-Annual)
 
Date Eastern Side of Waste Area
(%v/v)
Western Side of Waste Area
(%v/v)
13/12/2021 0 0
03/06/2022 0 0


NLF-16 Gas Monitoring (Methane Bi-Annual)
 
Date Bore Hole 1
(%v/v)
Bore Hole 2
(%v/v)
Bore Hole 3
(%v/v)
Bore Hole 4
(%v/v)
Bore Hole 5
(%v/v)
Bore Hole 6a
(%v/v)
Bore Hole 8
(%v/v)
Bore Hole 9
(%v/v)
13/12/2021 0 0 0 0 0 0 0 0
03/06/2022 0 0 0 0 0 0 0 0



The table below identifies the environmental monitoring/testing schedule and sampling results as indicated in the Environmental Protection Licence for special frequency (1) sampling for the first four rainfalls events that occur after the licence anniversary (18 September) that exceeds 20mm in 24 hours.

NLF–10
Date Rainfall Ph Total Suspended Solids
(mg/L)
12/10/2021 38mm 7 44
31/10/2021 31mm 7.1 13
12/11/2021 21.5mm 6.9 11
22/11/2021 31mm 7 29

The table below identifies the environmental monitoring and testing schedule and sampling results as indicated in the Environmental Protection Licence for the strategy for overflow sampling.

Pump No 2
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium
(mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
(mg/L)
Total Dissolved     Solids
(mg/l)
Conductivity (Us/cm)    
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 3.91 4.55 10.9   22 6   397 621
14/10/2021 14 5.08 0.54 8.26   17 6.1   355 555
18/10/2021 0 13.3 <0.02 14.6   45 6.4   686 1070
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 13.5 <0.02 13.5   28 6.3   474 741
30/11/2021 0 13.5 <0.02 13.5   31 6.3   465 727
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 N/A N/A N/A   N/A N/A   N/A N/A
7/02/2022 8 N/A N/A N/A   N/A N/A   N/A N/A
                     
24/02/2022 34 8.2 <0.05 8.2   30 6.4   340 532
25/02/2022 76 6.3 <0.05 6.3   12 6.4   325 508
28/02/2022 82 3.9 <0.05 3.9   28 6.3   205 320
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 8.15 0.05 9.36   16 6.4   369 577
29/03/2022 29 9.37 <0.02 10.5   17 6.4   370 578
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 3.57 1.46 6.55 5.1 474 6.2
8.6
177 276
07.07.22 83 4.94 0.06 5.39 5.6 31 6.1 12 258 403

NLF–13
 
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium
(mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
(mg/L)

Total Dissolved Solids  (mg/l)

Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021
112
11.9 4.32 19.4   69
6.4
 
540

843
                     
25/11/2021 22 6.41 <0.02 6.42   12
6.3
 
331

516
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 12.7 0.05 13   38 6.5   418 654
                     
24/02/2022 34 13.4 <0.05 13.4   68 6.8   482
 
753
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 11.5 0.03 12.7   40 6.5   391 610

 
                   
4th Quarter
(June – Aug)
                   
06.07.22 140 14.8 0.81 15.9 10 87 6.5 13 406 635
NLF–10
Date Rainfall
(mm)
Spillway Depth
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium
(mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon (mg/L)

Total Dissolved Solids (mg/l)

Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                     
13/10/2021 112 10
0.2

0.33

1.45
  45 7   227 355
14/10/2021 14 0
1.05

0.62

2.91
  23 6.7   283 442
18/10/2021 0 0
0.7

0.09

1.69
  7 6.9   370 577
                       
25/11/2021 22 0 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 10 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 5 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0 0.19 <0.02 1.11   14 6.9   304 474
30/11/2021 0 0 0.17 <0.02 1.09   13 6.9   297 464
1/12/2021 33 0 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 0 N/A N/A N/A   N/A N/A   N/A N/A
                       
2nd Quarter
(Dec – Feb)
                     
3/02/2022 52 N/A 0.2 <0.02 1.37   11 7   342 534
7/02/2022 8 N/A 0.66 <0.02 1.66   11 6.9   314 491
                       
24/02/2022 34 N/A 0.21 <0.05 0.81   30 7.1   201 314
25/02/2022 76 N/A 0.11 <0.05 0.64   12 7.3   148 231
28/02/2022 82 N/A 1.03 <0.05 1.15   22 6.6   120 187
                       
3rd Quarter
(March – May)
                     
28/03/2022 19 N/A 1.24 <0.02 1.89   19 6.9   184 288
29/03/2022 29 N/A 0.85 0.03 1.42   25 7.1   167 261
                       
4th Quarter
(June – Aug)
                     
06.07.22 140 30 0.17 0.64 1.34 4.8 26 7.0 8.4 194 304
07.07.22 83 5 0.02 0.16 0.72 1.2 8 6.1 13 39 61

NLF–11
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium (mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
 (mg/L)

Total Dissolved Solids (mg/l)

Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 0.03 0.1 0.99   60 6.8   130 203
14/10/2021 14 0.18 0.1 0.99   13 6.6   154 241
18/10/2021 0 0.17 0.03 0.68   9 6.7   223 349
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0.08 <0.02 0.62   5 6.9   150 234
30/11/2021 0 0.09 0.02 0.71   22 6.8   150 234
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 0.02 0.03 0.78   24 7   98 153
7/02/2022 8 0.08 <0.02 0.65   2 6.8   160 249
                     
24/02/2022 34 0.08 <0.05 0.5   50 6.7   74 116
25/02/2022 76 0.05 <0.05 0.46   7 6.8   83 130
28/02/2022 82 <0.05 <0.05 0.37   14 6.2   29 46
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 0.63 <0.02 1.16   5 6.9   94 148
29/03/2022 29 0.52 <0.02 1.06   31 6.9   78 122
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 0.02 0.23 0.79 1.3 46 6.4 11 26 40
07.07.22 83 0.13 0.07 0.79 1.7 12 6.7 12 71 110

PRP–1
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium (mg/L)
 
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
 (mg/L)
Total Dissolved Solids (mg/l) Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 0.02 0.1 1.07   70 6.8   140 218
14/10/2021 14 0.1 0.14 0.98   12 6.6   173 271
18/10/2021 0 <0.02 0.03 0.56   6 6.5   289 452
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0.04 0.02 0.58   6 6.8   174 272
30/11/2021 0 0.05 <0.02 0.57   5 6.8   172 269
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb)
                   
3/02/2022 52 0.02 0.02 0.74   19 7   107 167
7/02/2022 8 0.07 <0.02 `0.61   4 6.9   174 271
                     
24/02/2022 34 <0.05 <0.05 0.57   34 6.4   62 96
25/02/2022 76 <0.05 <0.05 0.41   4 6.7   87 136
28/02/2022 82 <0.05 <0.05 0.36   20 6.4   40 62
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 0.58 <0.02 1.16   7 6.8   98 153
29/03/2022 29 0.65 <0.02 1.2   34 6.9   84 131
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 0.02 0.26 0.96 1.2 58 6.3 11 22 35
07.07.22 83 0.06 0.14 0.75 1.7 26 6.6 8.8 54 84

NLF–12
Date Rainfall
(mm)
Ammonia
(mg/L)
Nitrate
(mg/L)
Total Nitrogen
(mg/L)

Potassium (mg/L)
Total Suspended Solids
(mg/L)
pH
Total Organic Carbon
(mg/L)
Total Dissolved Solids (mg/l) Conductivity (Us/cm)
1st Quarter
(Sept – Nov)
                   
13/10/2021 112 0.06 0.18 1.35   42 7.3   206 323
14/10/2021 14 0.07 0.2 1.61   22 7.1   185 290
18/10/2021 0 0.08 0.03 1.1   99 7.2   219 342
                     
25/11/2021 22 N/A N/A N/A   N/A N/A   N/A N/A
26/11/2021 0 N/A N/A N/A   N/A N/A   N/A N/A
27/11/2021 36 N/A N/A N/A   N/A N/A   N/A N/A
28/11/2021 1 N/A N/A N/A   N/A N/A   N/A N/A
29/11/2021 0.5 0.02 <0.02 1.01   7 7.2   195 305
30/11/2021 0 <0.02 <0.02 0.88   26 7   144 225
1/12/2021 33 N/A N/A N/A   N/A N/A   N/A N/A
2/12/2021 3 N/A N/A N/A   N/A N/A   N/A N/A
                     
2nd Quarter
(Dec – Feb0)
                   
3/02/2022
52
<0.02 <0.02 0.97   17 7.1   150 234
7/02/2022
8
<0.02 <0.02 1.01   10 7.2   182 284
                     
24/02/2022 34 <0.02 <0.02 0.66   31 6.9   118 185
25/02/2022 76 0.05 <0.02 0.63   19 7.1   118 184
28/02/2022 82 0.03 <0.02 0.42   124 7.1   55 86
                     
3rd Quarter
(March – May)
                   
28/03/2022 19 0.08 0.04 0.76   18 7.1   125 195
29/03/2022 29 0.04 0.03 0.8   29 7   121 189
                     
4th Quarter
(June – Aug)
                   
06.07.22 140 2.12 0.13 2.81 2.6 29 7.1 6.1 152 238
07.07.22 83 0.38 0.05 1.31 1.8 12 6.6 16 80 125

 

Environmental Compliance - Water and Sewerage